When to abandon something you have already built

Four cases where the question was not whether the work was good, but whether continuing it was the right use of the next six months.

Product strategyPaymentsFree to read

We killed a feature after six months of build. The reasoning held; the timing did not.

Adoption sat at 4% of target after two quarters. Four options on the table, three rejected. The decision to discontinue was defensible on the evidence available — the error was waiting two months longer than the criteria required.

M. OkonjoVP ProductHigh stakesWorked as intended11 min
EngineeringSoftware / SaaS

Rewriting the billing system instead of patching it for another year

The estimate was five months. It took nine. Whether that counts as a failure depends entirely on what the patching path would have cost, and that number is unknowable.

Anonymous (H7)Head of EngineeringHigh stakesMixed12 min
Client strategyProfessional services

We ended the contract with the client that was 41% of our revenue

No board, no runway, no second opinion. The decision took eight months to execute and the replacement revenue arrived four months later than the plan assumed.

J. WhitfieldOwnerExistential stakesWorked as intended10 min
FundraisingSoftware / SaaS

We took a down round instead of an acquisition offer. Eighteen months later the company closed.

An offer on the table at roughly half the last valuation, against a bridge at a 60% markdown. The reasoning was documented at the time. It did not survive contact with the following year.

S. LindqvistCo-founder and CEOExistential stakesDid not work14 min